New Pavement, Sidewalk and Curb, MorningStar Self Storage, Huntersville NC

Crown Paving crew and rollers compacting a new asphalt mat at a self-storage facility

A storage facility is unusual to pave because the whole property is drive aisle. Every door has to stay reachable, and the turning loads from box trucks and trailers concentrate in the same narrow paths all day.

Crown Paving self-performed the whole scope here: site work, asphalt, concrete, markings and fixtures. 12,570 square feet of new pavement went down on a 7 inch ABC stone base, 522 tons of it, with a 3.5 inch curb reveal left so the asphalt would finish flush.

The concrete is the part people notice on a site like this. 2,100 square feet of sidewalk, 540 linear feet of 18 inch curb and gutter, another 100 feet at 30 inch, and an ADA ramp with truncated domes. Four bollards went in painted safety yellow, and the lot finished with a van-accessible stall and 24 standard spaces.

Concrete being placed around bollard posts at a self-storage facility
Concrete being placed around bollard posts at a self-storage facility

Scope of Work

  • 12,570 SF of new pavement, built from the base up
  • 522 tons of ABC stone at 7 inches, left with a 3.5 inch curb reveal
  • 161 tons of binder at 2 inches, 121 tons of surface at 1.5 inches
  • 2,100 SF of 4 inch sidewalk and 650 SF of 6 inch flatwork
  • 540 LF of 18 inch curb and gutter, 100 LF of 30 inch
  • One ADA ramp with truncated domes, one van-accessible stall, 24 standard stalls
  • 185 LF of hash marks, 4 arrow stencils, 4 bollards painted safety yellow
  • Crown Paving crew finishing concrete around newly set bollards
  • Paver and roller laying and compacting a fresh asphalt mat, seen from above